{"id":90,"date":"2021-09-10T02:43:42","date_gmt":"2021-09-10T01:43:42","guid":{"rendered":"https:\/\/tssgr.wordpress.com\/?page_id=90"},"modified":"2026-03-25T14:42:22","modified_gmt":"2026-03-25T14:42:22","slug":"projects","status":"publish","type":"page","link":"https:\/\/tsgr.co.uk\/?page_id=90","title":{"rendered":"Projects"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>There are many activities ongoing at the railway, especially as the season closes and the maintenance period starts.&nbsp;<\/p>\n\n\n\n<p><strong>Loading Dock Extension:<\/strong><br>We are working on extending the track to a new loading dock in the maintenance compound.&nbsp; This will ease visiting locomotives and travel of our stock to other railways.<\/p>\n\n\n\n<p><strong>Engine Rebuilds:<\/strong><br>Having completed an extensive rebuild of our 7.1\/4&#8243; replica of the Ffestiniog&#8217;s &#8220;Linda&#8221; we have moved on to refurbishing &#8220;Preston&#8221; our other steam loco.<\/p>\n\n\n\n<p><strong>Our Petrol-Electric hybrid locomotive has had a substantial rebuild over the winter of 2025\/6, and should emerge with new electronic controls and a fresh coat of paint soon.<\/strong><\/p>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"550\" height=\"366\" src=\"https:\/\/tsgr.co.uk\/wp-content\/uploads\/2021\/09\/project_page_1.png?w=550\" alt=\"\" class=\"wp-image-96\" srcset=\"https:\/\/tsgr.co.uk\/wp-content\/uploads\/2021\/09\/project_page_1.png 550w, https:\/\/tsgr.co.uk\/wp-content\/uploads\/2021\/09\/project_page_1-300x200.png 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There are many activities ongoing at the railway, especially as the season closes and the maintenance period starts.&nbsp; Loading Dock Extension:We are working on extending the track to a new loading dock in the maintenance compound.&nbsp; This will ease visiting locomotives and travel of our stock to other railways. Engine Rebuilds:Having completed an extensive rebuild &hellip; <a href=\"https:\/\/tsgr.co.uk\/?page_id=90\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Projects<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":87,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-90","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/90","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=90"}],"version-history":[{"count":4,"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/90\/revisions"}],"predecessor-version":[{"id":269,"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/90\/revisions\/269"}],"up":[{"embeddable":true,"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/87"}],"wp:attachment":[{"href":"https:\/\/tsgr.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=90"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}